OUR PROJECT
One Finsbury Square, Level 6
CLIENT
APAM
CONTRACT TYPE
Traditional
PROJECT VALUE
£1.5m
Architect
GPAD London
Project Type
Commercial Fit-Out
PROJECT SUMMARY
After successfully completing the CAT A refurbishment across five floors and the reception area in 2022, Curo Interiors seamlessly transitioned into the CAT B refurbishment for the Level 6 offices.
Throughout the challenging 18-week PCSA period, our team executed modifications to building
services, encompassing electrical, mechanical, fire alarms, CCTV, and access control.
Despite the limited site footprint and the absence of storage space, we adeptly navigated the
project’s intricacies. Transporting substantial materials to the 6th floor without mechanical aids
presented a unique challenge, given the restricted access and occupied lower floors. Notably,
installing a 3-metre moving wall and high-spec acoustic partitions demanded thoughtful planning
within a tight timeframe, including the installation of heavy steel provisions in a confined ceiling
space.
Our detailed approach extended to achieving acoustic ratings amidst multiple challenges, such
as existing services above ceilings and hollow curtain walling. The benchmarks provided for the
acoustician’s review proved effective after rigorous testing.
The result is prime office space showcasing bespoke kitchen islands, seating areas, and planters.
We take pride in delivering a project of high standards, meeting stringent acoustic specifications,
and ensuring client satisfaction from occupied offices on lower floors.
Get In Touch
We’d love to hear from you. To find out more about services and company ethos, simply reach out below.